MASJID AL QADIM
SIBU, SARAWAK
CONSERVATION
PROJECT INFORMATION
Location
Details
City / State
Address
GPS Coordinate
Sibu, Sarawak
Sibu, Sarawak
Latitude
2°17'34.11"N
Longitude
111°49'29.05"E
Client
Consultant / Architect
Date & Duration of Project
Lembaga Amanah Kebajikan Islam Sibu (LAKIS)
UCST Consultancy Services Sdn Bhd
22nd May 2017 (6 Months)
22nd December 2018 (2 Months)
04th June 2018 (12 Months)
Contractor
Conservator
Project Cost
Wan Mas Construction,
Ahza General Work &
Jati Igan Sdn Bhd
Assoc. Prof. Ar. IDr. Ts. Haris Fadzilah Abdul Rahman
Approx. 250,000.000 MYR
PROJECT SYNOPSIS
The Conservation of Masjid Al Qadim
Masjid Al-Qadim is located at the junction of Jalan Kampung Nyabor and Jalan Tun Abang Haji Openg, Sibu. Lembaga Amanah Kebajikan Islam Sibu (LAKIS) has been responsible for managing and maintaining the building. Masjid Al-Qadim is believed to be the third masjid in Sibu. The first and second masjid was built at Kampung Pulau Berendam area (Lau King Howe Hospital original site), but they were demolished to give way to the development of Fort Brooke and his administrative office. The precise date when Masjid Al-Qadim was built was not known. According to Jabatan Agama Islam Sarawak, Masjid Al-Qadim was built around 1861, while other documentation believed that the masjid was built two years before the volcanic eruption of Krakatoa in 1881.
The restoration of Masjid Al-Qadim was done in 3 phases. Phase 1 involved the restoration of the roof and minaret. Phase 2A involved the demolition work of the floor tiles and other structures that were not to the original design. Lastly, Phase 2B involved the restoration of the rest of the building components, rebuilding the ablution area, and construction of a new toilet area. In Phase 1, a temporary roof was installed to carry out the existing roof's dismantling, repair, and replacement work. The temporary roof was constructed from metal decking and steel posts, which allow sufficient height for working space within the covered area of the roof.
CONSERVATION TIMELINE
Before
Conservation


FRONT VIEW
22nd May
2017
During
Conservation


CONSERVATION WORKS IN PROGRESS


FRONT VIEW