MASJID DIRAJA SULTAN ALA’EDDIN
BANTING, SELANGOR
CONSERVATION
PROJECT INFORMATION
Location
City / State
Address
GPS Coordinate
Banting, Selangor
Kg. Bandar, Banting, Selangor
Latitude
2.86338
Longitude
101.43987
Details
Client
Consultant / Architect
Date & Duration of Project
Majlis Agama Islam Selangor
Arkitek Punca Cipta Sdn. Bhd.
16th April 2015 –
17th April 2018
Contractor
Conservator
Project Cost
Smart Reliance Sdn. Bhd.
Hj. Kamarudin Md. Said (Conservator Contractor)
9,335,450.00 MYR
PROJECT SYNOPSIS
The Conservation
of
Masjid Diraja Sultan Ala’eddin
Masjid Diraja Sultan Ala’eddin or known as Masjid Bandar was constructed in 1905 and completed in 1914. It was named after the late Sultan Ala’eddin Sulaiman Shah Ibni Almarhum Raja Muda Musa, the 5th Sultan of Selangor (1898 -1939). According to a historical account, the mosque was erected upon initiative and contribution to the construction fund by his Highness Sultan Ala’eddin himself. The mosque was officiated on the 18th June 1924. It was registered under the National Heritage Act 2005 as National Heritage in 2005 by the National Heritage Department.
The mosque's design is much influenced by Mughal architecture, having a central Main Dome with a perimeter of smaller domes with a design adaptation of the onion dome. The walls are topped at all sides by decorative pinnacles and crenels. A series of arch-shaped openings at the perimeter walls encourages good natural ventilation and lighting in the mosque.
The main work scope of the conservation from 2015 until 2018 is to restore Masjid Sultan Ala’eddin to its original form. The works include the demolition and removal of all extension works and added elements that do not according to its original architecture.
CONSERVATION TIMELINE


THE CONDITION MASJID ALA’EDDDIN BEFORE CONSERVATION WORKS IN 2015


INTERIOR OF THE MAIN PRAYER HALL WITH TIMBER FINISHES AT THE WALL AND CEILING


THE EXTENDED PRAYER HALL (RUANG LIMPAH) BEFORE CONSERVATION IN 2015
Before
Conservation
16th April
2015


THE CONDITION MASJID ALA’EDDDIN BEFORE CONSERVATION WORKS IN 2015


THE CALLIGRAPHY MEDALLION FITTED AT THE CEILING OF THE MAIN PRAYER HALL


THE CONDITION OF THE SIDE DOME BEFORE CONSERVATION


INSTALLATION OF A TEMPORARY ROOF ABOVE THE MAIN PRAYER HALL


REMOVAL WORKS OF THE EXISTING METAL DOME


PAINT REMOVAL WORKS AT THE WALL OF RUANG LIMPAH


LIME PLASTERS WERE REMOVED AT 1200MM HEIGHT FOR DAMPNESS TREATMENT


PROCESS OF STRENGTH TEST AT THE DOME USING REBOUND HAMMER


THE NEW METAL ROOF STRUCTURE AT RUANG LIMPAH


THE WORKER PREPARED A LIME PLASTER MOCK-UP ON THE INTERNAL WALL


PAINT COLOUR SCHEME STUDY ON THE INTERIOR WALL OF THE MASJID


THE INSTALLATION OF NEW ROOF TILES AT THE MAIN PRAYER HALL’S ROOF
During
Conservation


INSTALLATION OF A TEMPORARY ROOF ABOVE THE MAIN PRAYER HALL


REPAIR WORKS OF THE ORIGINAL CONCRETE DOME


PLASTER REMOVAL WORKS FOR DAMPNESS TREATMENT


PAINT REMOVAL USING THE SODA BLASTING METHOD


INSTALLATION OF NEW PLASTER CEILING AT THE MAIN PRAYER HALL WITH THE ORIGINAL TIMBER MEDALLION AND CARVINGS


PAINT REMOVAL AT THE OUTER DOME OF THE MASJID


THE COMPLETED LIME PLASTER MOCK-UP


THE CONSERVATION WORKS AT THE MASJID’S MINARET


THE CRACK REPAIRS ON THE ARCHES


THE FRONT FAÇADE OF MASJID SULTAN ALA’EDDIN AFTER CONSERVATION WORKS IN 2018


THE MASJID WAS PAINTED WHITE AS THE ORIGINAL


THE INTERIOR OF THE RUANG LIMPAH AFTER CONSERVATION


THE NEW METAL ROOF FOR THE RUANG LIMPAH
After
Conservation
17th April
2018


THE FRONT FAÇADE OF MASJID SULTAN ALA’EDDIN AFTER CONSERVATION WORKS IN 2018


THE INTERIOR OF THE MAIN PRAYER HALL AFTER CONSERVATION


THE CONDITION OF DOME AND ROOF OF THE MAIN PRAYER HALL AFTER CONSERVATION