top of page
Downsized Logo_edited.jpg

RUMAH KUTAI PERAK
KAED,  IIUM

IIUM, SELANGOR

CONSERVATION

Arrow Down

PROJECT INFORMATION

Location

Details

City / State

Address

GPS Coordinate

IIUM, Selangor

Kulliyyah of Architecture & Environmental Design, International Islamic University Malaysia,

Jalan Gombak, Selangor

Latitude

3.25079

Longitude

101.73093

Client

Consultant / Architect

Date & Duration of Project

International Islamic University Malaysia

KAED Team

(Prof. Ar. Dr. Abdul Razak Sapian, Ar. Dr. Srazali Aripin, Dr. Nurul Hamiruddin Salleh & Sr. Mohd. Azrin Mohd Din)

June 2017 – Mac 2018

Contractor

Conservator

Project Cost

Al Shakirin, Enggor, Perak

KAED Team

(Prof. Ar. Dr. Abdul Razak Sapian, Ar. Dr. Srazali Aripin & Dr. Nurul Hamiruddin Salleh)

160,000.00 MYR

PROJECT SYNOPSIS

The Conservation of Rumah Kutai Perak, KAED, IIUM

The project was begun in June 2017 and successfully completed in March 2018. The Kutai house is originally from Jalan Seputeh, Parit, Perak and believed to have been built in 1920. Its original owner was a village headman or chief. The house has Rumah Anjung measuring 2.76m x 4.52m with 16 columns and Rumah Ibu measuring 7.24m x 7.03m. The chengal wood-structured house also has a single room and kitchen house.

 

All the house components were carefully dismantled at the original site before being repaired at the contractor workshop in Kuala Kangsar. After repaired, the house components were transported more than 200km to the new site at the Kulliyyah of Architecture & Environmental Design (KAED) in IIUM Gombak’s campus.

 

The house is a part of the KAED Malay Enclave Teaching Lab, a teaching laboratory for the students of KAED especially its architecture students. The house was officiated by Tan Sri Dato’ Seri Utama Dr Rais Yatim, the IIUM President and the project Patron, on April 19, 2018. This project is also to help in preserving our traditional built heritage as well as promoting it to local and international visitors while visiting the university.

CONSERVATION TIMELINE

BEFORE 1.png
BEFORE 1.png

THE HOUSE AT THE ORIGINAL SITE BEFORE DISMANTLE WORKS

BEFORE 3.png
BEFORE 3.png

MAIN STRUCTURES OF THE HOUSE ARE STILL IN GOOD CONDITION

Before
Conservation

June 

2017

BEFORE 2.png
BEFORE 2.png

THE CONDITION OF ANJUNG BEFORE DISMANTLE WORKS

BEFORE 4.png
BEFORE 4.png

MAIN STRUCTURES OF THE HOUSE ARE STILL IN GOOD CONDITION

DURING  1.png
DURING  1.png

ERECTION OF MAIN COLUMNS AND FLOOR BEAMS AT THE NEW SITE

DURING 3.png
DURING 3.png

THE INSTALLATION OF WALL PANELS

DURING 5.png
DURING 5.png

THE INSTALLATION OF NEW ROOF FINISHES (ONDULINE SHEET)

During
Conservation

DURING 2.png
DURING 2.png

THE INSTALLATION OF FLOOR AND ROOF COMPONENTS

DURING 4.png
DURING 4.png

WALL PANELS WERE ERECTED MANUALLY

DURING 6.png
DURING 6.png

THE INSTALLATION OF NEW SELANG AT BACK OF THE HOUSE

AFTER 1.png
AFTER 1.png

FRONT VIEW OF THE HOUSE AFTER RECONSTRUCTION PROCESS

AFTER 3.png
AFTER 3.png

 THE COMPLETED NEW SELANG AT BACK OF THE HOUSE

After
Conservation

March 

2018

AFTER 2.png
AFTER 2.png

THE CONDITION OF THE HOUSE AFTER RECONSTRUCTION PROCESS

OTHER RESOURCES

RUMAH KUTAI IIUM
IIUM Rumah Kutai Others
IIUM Rumah Kutai Timeline
IIUM Rumah Kutai Synopsis
IIUM Rumah Kutai Info